Work to remove the existing marble so that the new chancel support can be constructed and to make space for the expanded chancel has begun.  The gold and white diamond in the center of the chancel has been cut out and is being saved for re-installation in the new space.  Marble in the nave is also being removed saving as much as possible.  Meanwhile a wood ramp and path is being constructed so that the demolition materials can be wheel-barrowed out without damaging the main aisle.

 