Work on footings continues. Original foundation found

The base of the first two footings has been poured.  Work is proceeding slowly as the excavation, which has to be done by hand, is encountering a considerable amount of stone.  The rear wall of the original chancel has been exposed and is obstructing the planned location of several of the new footings.